Diversions and delays expected across south Dublin
Motorists and pedestrians face a busy week as closures, resurfacing and crossing works affect routes throughout Dún Laoghaire-Rathdown. The council has also received an application for gas-related restrictions in Dalkey in December.
Road users in Dún Laoghaire-Rathdown should allow extra time between 14 and 20 November, with closures, resurfacing and temporary traffic controls planned across the county.
Brides Glen Road in Shankill remains closed between Rathmichael Road and Mullinastill Road until 28 November for watermain installation; diversions are signposted. Alternative traffic layouts remain on the westbound Wyattville Link Road until 30 November during underpass construction.
Other scheduled works include:
- Glenamuck Road North: crossing works near Carrickmines Luas Stop until 1 December, with Stop/Go controls from 10am to 4pm.
- M50 Junction 14: overnight lane closures until 4 December, from 10pm to 6am; daytime Stop/Go controls may be needed on Blackthorn Road.
- Mart Lane/Bray Road junction and Ulverton Road: daytime Stop/Go controls for crossing and ramp works until 20 November; Ulverton works begin on 16 November.
- Rock Road: a lane closure for resurfacing on 17 and 18 November, from 7.30pm to midnight. Temple Road/Temple Park Avenue junction will be resurfaced at the same hours on 19 November.
- Blackrock water upgrades continue until 30 November. Footway and car park works at Cois Coille and The Lough Inn run from 16 November to 1 December, with short access restrictions possible.